Thanks to Arne and the other Junk Rig Pioneers for publishing their research and experimentation.
I have beginner's questions: How much adjustment is necessary to the sail control lines when reefing or making large changes in sheeting, and how often?
Related to that, what has proved to be the best way to manage all the loose ends of rope? I was thinking of fitting spools downstream of the cleats to take up all the slack and keep things tidy; all of the control lines accessible from the main hatch. Adding in self steering, it's going to get messy...
Further, is there any way of gaining the ability to heave to? My thought was to have a double sheet system rather than single leach sheeting, and to have the attachment points to the hull on tracks adjustable fore & aft....giving the ability to haul the sail to windward for more maneuvering options.
I have beginner's questions: How much adjustment is necessary to the sail control lines when reefing or making large changes in sheeting, and how often?
Related to that, what has proved to be the best way to manage all the loose ends of rope? I was thinking of fitting spools downstream of the cleats to take up all the slack and keep things tidy; all of the control lines accessible from the main hatch. Adding in self steering, it's going to get messy...
Further, is there any way of gaining the ability to heave to? My thought was to have a double sheet system rather than single leach sheeting, and to have the attachment points to the hull on tracks adjustable fore & aft....giving the ability to haul the sail to windward for more maneuvering options.