I relatively recently put A/C in my shop and can't tell you the joys of having environmental control. I even have a single car garage sized space, where I can cook up to about 130 (55c) degrees, with very low humidity. The ability to apply slow formulations, for lots of positioning and pot life time, then the ability to get a workable cure, in just a few hours is hard to describe. Working in a clean and dry shop is a big plus too, particularly when it's 95 (35c) degrees outside with 90% humidity, which it will be for another few months down here.
If I was to take on a project like this, I'd consider building upright, instead of upside down. Rolling a 50' yacht isn't an easy nor inexpensive thing, even if you have a buddy that owns a portable 100 ton crane, like I do. It makes hanging planking a little different, but it can be worked out. I'd also purchase much of the hardware and major systems as I find them, rather than when I need them. An engine can lie on a pallet for a year or two, until it's time to install it, if you find a good deal somewhere. I'd also consider building full sections of interior and "systems" as installable units, rather than in place. These can be stored in a container or under a shed roof, until it's time to toss them in the boat. You could have a head unit, engine room, bank of batteries, galley, staterooms, etc. all ready to lower into the completed hull. This will save much up and down the ladder work, trust me. Fitting furniture into the boat, usually requires some major tools live inside the boat during the process, which is a pain in the butt, but quite common on a build of this scale. The same applies for materials, so this pre-assembled element approuch, makes a lot of sense with a limited build team.
Lastly, consider your budget a good guess at about 1/2 of what the real costs will be. The same is true of your time. You might find you can put in 8 hours, but the actual production time is 4 if you're lucky. This assumes you're reasonably skilled with tools and most importantly of all a capable problem solver. In fact, your problem solving skills will be the deciding factor. If you're the type that can look at things from different angles and perspectives, seeking a solution, you'll do well. If you're the type that needs a set of plans, searches Google and looks for instructions to clear things up, you should skip over this dream and take up basket weaving instead, as this project will present thousands of opportunities to test your problem solving skills (not even remotely kidding), in literally every facet of the build process.
If I was to take on a project like this, I'd consider building upright, instead of upside down. Rolling a 50' yacht isn't an easy nor inexpensive thing, even if you have a buddy that owns a portable 100 ton crane, like I do. It makes hanging planking a little different, but it can be worked out. I'd also purchase much of the hardware and major systems as I find them, rather than when I need them. An engine can lie on a pallet for a year or two, until it's time to install it, if you find a good deal somewhere. I'd also consider building full sections of interior and "systems" as installable units, rather than in place. These can be stored in a container or under a shed roof, until it's time to toss them in the boat. You could have a head unit, engine room, bank of batteries, galley, staterooms, etc. all ready to lower into the completed hull. This will save much up and down the ladder work, trust me. Fitting furniture into the boat, usually requires some major tools live inside the boat during the process, which is a pain in the butt, but quite common on a build of this scale. The same applies for materials, so this pre-assembled element approuch, makes a lot of sense with a limited build team.
Lastly, consider your budget a good guess at about 1/2 of what the real costs will be. The same is true of your time. You might find you can put in 8 hours, but the actual production time is 4 if you're lucky. This assumes you're reasonably skilled with tools and most importantly of all a capable problem solver. In fact, your problem solving skills will be the deciding factor. If you're the type that can look at things from different angles and perspectives, seeking a solution, you'll do well. If you're the type that needs a set of plans, searches Google and looks for instructions to clear things up, you should skip over this dream and take up basket weaving instead, as this project will present thousands of opportunities to test your problem solving skills (not even remotely kidding), in literally every facet of the build process.