Passage to Lavrion Greece
Interior was revarnished and repainted with epoxy based paints and clear coatings/epifanes.
At anchor Greece
the original bronze bell and the lewmar winches
deck was reinforced dynel&epoxy and painted antiskid epifanes, deck hardware replaced by bronze classic marine and deck prisms added. prima...
transported by the 80 tons crane the old racer travels to new life.the restyoration and upgrading took two years three months. details on...
the launching wich was quite happy; and went on well; at Constantza Industrial Harbor on a Sunny September perfect day details on...
transom was rebuilt and cold molded; the topsides were painted with epifanes; boottop painted blue; name is here being re-painted. this was the...
wooden cradle we built in order to safely withstand the ++300 km road journey from Bucharest to Constantza Harbour
Rocquette launching Constanta harbor
Lead ballast has been re-fastened by custom made bronze bolts, copper antifouling paint under the LWL; topsides were painted and polished, new...
Western Red Cedar "frameless" strip planking fiberglass &epoxy sheating 36 ft cruiser racer . Minimal framing is going to...
Here are our core four craftsmen, Nicodim, Cotovanu , Paul, Lucian, plus three french students were helping through the summer:Marouene, Ramzy...
we rolled the hull over in order to make sanding ; epoxy penetration and cold molding more efficient . cold moulding three layers veneer; epoxy...
Al the steel fastenings through the +40 years old hull were badly corroded. All were removed and replaced by bronze fastenings; The framing was...
three layers veneer impregnated in epoxy; first two layers diagonally; third layer horizontally;three coats epoxy on the outside. the framing was...
42 ft hull turned for cold molding
most framing , most floors and 70% planking were rebuilt in laminated ash epoxy capsulated; the hull was rolled on two massive wood wheels; in...