the deck was reinforced by one layer dynel set in west System
bulwarks were rebuilt by laminating 12mm on.
new brass deck hardware and deck prisms frm Classic Marine Suffolk UK
after sailing her frm genova to bucharest , take paint off and here's the sorry condition she was in.
++70% of framing was rotten at bilge section.the double planking was completely rotten at bilge section. the four ring frames in steel were compltely corroded.all fastenings were steel, badly...
here the new laminated mast step bearing structure we built; previously in badly corroded steel. I made the mast step "plate " in 20mm stainless steel plate.
each planking strake was cold moulded frm three layers oak veneer.keel, knees, stem, stern frame were laminated frm 4mm ash.the boat was epoxy capsulated and clear coated.
vintage camper&nicholsons sloop restoration
we rebuilt and replaced most framing by laminated framing; laminated floors;
cold molded two layers veneer over the whole hull; rebuilt thje deck by dynel set in epoxy ;
changed all original steel fastenings wich were badly corroded by bronze...
Composite cruiser 27 test launching ;Giurgiu on Danube River.Photo taken secs before hitting water.
Hull in polyester ; 50%vinylester and hand laind fiberglass 25mm thick; okoume cored framinmg and composite deck and cabin; 220 hp diesel ; bowthruster and mahogany interior.
details...