Page vi VOLUME I INDEX
Page
Task 8 Plumb Remaining Hull Frames and Brace............. 88
Task 9 Temporarily Brace Hull Frames to Support Structure Sides...... 88
Task 10 Weld Stem-Piece to Bow Frames................. 90
Task 11 Erect Scaffolding to Support Structure.............. 91
JOB 8 - Check Hull and Deck Exterior for Fairness............... 92
Task 1 Check Hull Exterior for Fairness................. 93
Task 2 Check Deck Exterior for Fairness................ 94
Task 3 Stem and Keel Reinforcing................... 95
Task 4 Keel Deadwood Reinforcing.................. 98
Task 5 Weld Longitudinal Spacer Rods to Hull Frames........... 100
Task 6 Weld Transom in Place.................... 101
STAGE 2
JOB 1 - Applying Rods and Mesh...................... 102
Task 1 Make Mesh Folding and Cutting Bench.............. 102
Task 2 Fold and Cut Mesh...................... 102
Task 3 Applying First Four Layers of Mesh to the Hull........... 103
Task 4 Apply Mesh to Transom Interior................. 106
Task 5 Fasten Longitudinal Reinforcing Rods Above the Mesh........ 106
Task 6 Remove Underlying Spacer Rods, Replace with Longitudinal
Reinforcing Rods Overlying the Mesh............. 109
Task 7 Weld Vertical Rod Reinforcing at Three-Inch Centers......... 110
Task 8 Make Starter Rod Jig..................... 112
Task 9 Make Starter Rods...................... 113
Task 10 Weld Starter Rods Along Diagonal "D' Line............ 114
Task 11 Weld Hull Reinforcing Rods at Stem, Keel and Transom........ 115
Task 12 Staple Interior Mesh to Longitudinal Rods............. 117
JOB 2 — Deckhead Lining Preparations.................... 118
Task 1 Marking Deck Apertures.................... 118
Task 2 Making Longitudinal Beams for Deck Apertures........... 118
Task 3 Weld Deck Aperture Beams in Place............... 119
Task 4 Make Deck Ventilator Coamings................. 121
Task 5 Weld Deckhead Lining Supports................. 122
Task 6 Clean and Prime Deck Steel Work................ 123
JOB 3 - Laying Deckhead Lining...................... 123
Task 1 Fitting Wooden Deckhead Planks................ 123
Task 2 Installing Deck Ventilator Coamings............... 127
Task 3 Paint Deckhead Planking.................... 128
Task 4 Fitting Insulation Material................... 128