Two Bob Peter
Junior Member
- Joined
- Jul 8, 2017
- Messages
- 12
- Reaction score
- 1
- Location
- Australia
I am looking at building 2 x new aluminium masts to replace missing timber masts on a 50' gaff schooner.
Looking for technical assistance to confirm suitability of aluminium sections and actual design specifications.
Cheers
Looking for technical assistance to confirm suitability of aluminium sections and actual design specifications.
Cheers