StuckForward1020
Junior Member
- Joined
- Aug 29, 2024
- Posts
- 5
- Reaction score
- 0
- Location
- Louisiana
Hey all, this question is for a fictional book I'm writing which makes this post mostly theoretical. Althouth the design here was something I worked on a few years ago and would of been my first venture into sail and hopefully will one day be a reality
The Goal is to build a canoe that will be fast on the water in order to sail upstream The Pear River ~320 miles to Jackson Mississippi w/ two people, there dog, and gear. (about 500 lbs when combine with the boat and sailing rig)
The mast needs to be both removable w/o too much effort to pass under low bridges and have a furling system.
So heres the design I came up with a few years ago w/ a few tweeks due to the resources available to the characters.
My first question is if I need to add more stays than the one to the front and if so how many. ie. one front and rear or one in all 4 directions. The less there are the easier the sail will be to take down. ( the plan is to furl both sails loosen the stays and pick the sail up and over the 3/4 pipe thats acting as a peg )
What size and shape of sails should I choose and should it have/ does it need a boom?
For the main sail I was thinking about 11.5 x 6 to 8 (~63-92 Sq ft) and the jib about 45-70 Sq ft. Ideally the sails are cut as large as possible (within reason) and can be furled to size to match the wind conditions.
Where should the leeboards be placed?
here's a description to go with the diagrams:
Based off a 16 foot canoe. I want to put the mast right behind the front seat. ~5ft from the front. Starting from the floor of the canoe is a thick base. attached to the top of the base is Galvanized flange for 3/4 pipe. A 2 to 4 foot piece of 3/4 pipe(1.05 OD) goes into the flange. This pipe acts as a peg that the mast slipps over. The mast is made of 1 3/8 galvanized top rail from a chain link fence. screwed in at the top side walls of the canoe(Level with the seat) are two 2x4s sandwiching the "front and back" of the mast. 2 more boards are used to sandwich the left and right sides making a square with just enough space for the mast to sit inside. A 1.5" pvc pipe is slide over the mast and rest ontop the 2x4s. This is to be able to furl and unfurl the sail. A 1/2 pvc pipe is slide over the Main stay in order to attach and furl the jib. Measuring from the side wall of the canoe the sail sit's between 2 and 2.5 ft and from the side wall to the top the mast is ~14ft
The Goal is to build a canoe that will be fast on the water in order to sail upstream The Pear River ~320 miles to Jackson Mississippi w/ two people, there dog, and gear. (about 500 lbs when combine with the boat and sailing rig)
The mast needs to be both removable w/o too much effort to pass under low bridges and have a furling system.
So heres the design I came up with a few years ago w/ a few tweeks due to the resources available to the characters.
My first question is if I need to add more stays than the one to the front and if so how many. ie. one front and rear or one in all 4 directions. The less there are the easier the sail will be to take down. ( the plan is to furl both sails loosen the stays and pick the sail up and over the 3/4 pipe thats acting as a peg )
What size and shape of sails should I choose and should it have/ does it need a boom?
For the main sail I was thinking about 11.5 x 6 to 8 (~63-92 Sq ft) and the jib about 45-70 Sq ft. Ideally the sails are cut as large as possible (within reason) and can be furled to size to match the wind conditions.
Where should the leeboards be placed?
here's a description to go with the diagrams:
Based off a 16 foot canoe. I want to put the mast right behind the front seat. ~5ft from the front. Starting from the floor of the canoe is a thick base. attached to the top of the base is Galvanized flange for 3/4 pipe. A 2 to 4 foot piece of 3/4 pipe(1.05 OD) goes into the flange. This pipe acts as a peg that the mast slipps over. The mast is made of 1 3/8 galvanized top rail from a chain link fence. screwed in at the top side walls of the canoe(Level with the seat) are two 2x4s sandwiching the "front and back" of the mast. 2 more boards are used to sandwich the left and right sides making a square with just enough space for the mast to sit inside. A 1.5" pvc pipe is slide over the mast and rest ontop the 2x4s. This is to be able to furl and unfurl the sail. A 1/2 pvc pipe is slide over the Main stay in order to attach and furl the jib. Measuring from the side wall of the canoe the sail sit's between 2 and 2.5 ft and from the side wall to the top the mast is ~14ft