It's been awhile so let's get back up to speed: She:Kon Bateau TW28 modified

Worked a bit in the keel this morning. Have to get the holes lined up for the skeg. Overdrilled so they can be filled with epoxy prior to installing the skeg. I got 5 of the 7 holes done today before it got too warm in the shed.

IMG_1825.jpg


Ya never get used to drilling holes in hull you just spent so much time on getting it right! :rolleyes:

Few more pics & cordless drill battery repair on today's web log update: https://she-kon.blogspot.ca/2016/08/more-box-keel.html
 
Thanks, Rick.

Peanut supervises now.
 

Attachments

  • WP_005713.jpg
    WP_005713.jpg
    300.5 KB · Views: 531
Got all the holes drilled & gouged out. Managed NOT to cut all the way through! :D

A good healthy coat of mold release was on the bolts and I stuffed them 'up' through the holes in the bottom of the keel. Taped them in place and backfilled the holes with epoxy & chopped strands.

IMG_1835.jpg


When these are setup tomorrow I'll pull the bolts & sand smooth. Inching every closer to installing the skeg.

Few more pics on the web log update: https://she-kon.blogspot.ca/2016/08/dri ... lling.html
 
Forum posts represent the experience, opinion, and view of individual users. Boat Design Net does not necessarily endorse nor share the view of each individual post.
When making any potentially dangerous or financial decision, always employ and consult appropriate professionals. Your circumstances or experience may be different.

  • Back
    Top