rob denney
Senior Member
- Joined
- Feb 13, 2005
- Messages
- 985
- Reaction score
- 392
- Location
- Australia
Decided I'm not going to die wondering, so I ordered the composite materials and vacuum equipment for a C50 and employed a kiwi boat builder/foreman to ensure it is built to a high standard. Also to give me time to work on other projects such as the cargo proa testing and certification, recycling plastic, dessicating (not composting) toilets, electric cars, solar farms, motorised shipping containers (maybe) and advocacy for remote villagers.
The boat will be built here (CATD Fiji) by graduates of our 2024 Sustainable Boat Building Course, starting in February. We will video the build and record the costs and hours. Build time is unknown as building village suitable boats (fishing canoes, solar/electric water taxis and mini cargo proas) will have priority.
Materials spreadsheet attached. Enough to build all the composite parts, including unpainted hulls, decks, fitout, 2 carbon masts incl tracks, booms, beams and rudders. Amounts are based on areas, plus ~10% wastage, plus rounding up to next roll, box or sheet. Shipping, tax and duty will add about 35%. Tax and duty should be reclaimable if the boat is exported.
I'm not sure I will be able to resist the temptation to experiment, but the intention is to build it according to the plans.
. Only deviation so far is to use 20mm 100 kg foam on the bottom instead of 25mm 80 kg.
The boat will be built here (CATD Fiji) by graduates of our 2024 Sustainable Boat Building Course, starting in February. We will video the build and record the costs and hours. Build time is unknown as building village suitable boats (fishing canoes, solar/electric water taxis and mini cargo proas) will have priority.
Materials spreadsheet attached. Enough to build all the composite parts, including unpainted hulls, decks, fitout, 2 carbon masts incl tracks, booms, beams and rudders. Amounts are based on areas, plus ~10% wastage, plus rounding up to next roll, box or sheet. Shipping, tax and duty will add about 35%. Tax and duty should be reclaimable if the boat is exported.
I'm not sure I will be able to resist the temptation to experiment, but the intention is to build it according to the plans.