To install this app on your iPhone:
Note: This feature may not be available in some browsers.
You cannot build a 44' sailing yacht in 24 months alone.
You certainly can't give a proper answer to the question I made.
3. If you ever decide to take up residence in the EU you are eligible for VAT exemption on your entire household, this includes vehicles like your boat. When you do this you also change flag to a EU country. Some jurisdictions will require a CE conformity declaration for this, some don't (it's complicated), but you need it for legal reasons if you ever want sell the boat. It's still cheaper then VAT tough.
I built this boat in 60 months and about 12,000 labor hours. Just trying to help you grasp realities. This is a 32' cat. Most professional yards would not commit to that time of 24 months for you, too many variables on labor. Despite your snark, I wish you success. If you have two years to build it and must build it away from Norway, I'm only trying to help you understand the 24 month time budget is probably inaccurate. Things as simple as placing large plates are not really one man jobs. I think, in general terms, I would get the hulls done (anywhere) and then finish her where you can spend 24 months fitting out.
This build was in Minnesota, fiberglass and slower than ally, but once the boat was too big for inside; she had to go out into the unheated space and this adds time to the build as Rumars warns.
I had no overhead crane, just a small gantry that could pick 1500 pounds. You will have trouble lifting large masses in the early parts of the build if you think you don't need, etc.
I would love to hear from any builders who built a 44' sailing vessel in under 8000 hours.
Somewhere here, we have seen a formula for hours based on length, depth, beam, but I don't recall it atm.
View attachment 180810View attachment 180811
I guess the big question is how good are you at welding aluminum? The downside of alloy hulls is you start with bulkheads and then work on the hullbplating. I.e. the most important welds of the project are first. From router cut panels to a boat shape can be rather quick, shockingly so with proper design. After that becomes the question of how much bead can you cut an hr. To give you a perspective the aluminum outfit I worked at years ago we could tack together a 32 ft hull in 3 days it looked like a boat. Then two really skilled welders took 3 weeks to finish the bead.
Will you have full time to dedicate to the project? Or will this be a nights and weekends sort of thing?
Having averaged anywhere from 2-5000 lbds of aluminum purchased a year (barely enough to keep my commercial account active) its a world wide commodity and local prices are as much dictated by policy out of local control. It's come down in the last few months but is still near double 2019. All that to say price savings in alloy will be easily offset with other cost.
The bigger question is where do you want to live the next couple of years? Building a 44 footer from scratch even with a lot of trade knowledge is a big undertaking. Probably a success rate under 10% on completion, I'd Hazzard on time and umder budget .01%. So find a place you want to live and go from there.
If you build in the EU the norvegian tax relief conditions are not that problematic. You will become an EU resident anyway by default of living there, so we have 2 years building time, 1 year shakedown cruise and further boat improvement, wich leaves you with 2 years to meet the 5 year requirement. You can either spend them cruising or working somewhere in the EU.
Further analysis of "WHERE" is only possible with hard numbers. Absolute minimum workshop space for your build is 100sqm (not comfortable and you need additional storage elsewhere), so how much does this cost in Norway? If you want to build full time add living space for yourself, food, transportation, etc.
My minimum estimation for full time EU living is 1000-1500€/month and this implies a long research with many on site visits to find a suitable place.