    dear all,
    I,m Ricard, a italian student;
    for my project I have to settle on a supply vessel a crane, what must I do to limit the maximum distance and maximum angle of the crane?
    from the point of view of the structure what should I expect?
    how must i verify a new stability?

    Many thanks in advance
    Best Regards
     
  2. BATAAN
    Joined: Apr 2010
    Posts: 1,614
    Likes: 101, Points: 0, Legacy Rep: 1151
    Location: USA

    BATAAN Senior Member

    What capacity is the vessel? What is the crane expected to lift? You are very vague in your questions. Even crude drawings help tremendously.
    All you need to know is in standard engineering texts.
     
  3. jehardiman
    Joined: Aug 2004
    Posts: 3,762
    Likes: 1,152, Points: 113, Legacy Rep: 2040
    Location: Port Orchard, Washington, USA

    jehardiman Senior Member

    Shipboard crane rule #1....The suspended load is applied as if it's mass and CG is at the upper sheave box axle. After that everything falls out (as Bataan said) from the standard engineering/stability texts which will include dynamic seaway loads due to roll, pitch, and yaw.
     