Hull was rebuilt and three layers cold molded veneer in west system added over the outer surface.
Original framing was replaced by cold moulding framing.
deck was rebuilt by taking off the weakened plywood on fastenings rows upon the beams,and scarfing in new plywood; adding a cold moulded solid wood sheer strake, adding a solid wood&epoxy forward section, and reinforced by dynel&epoxy.all steel deck as well as hull fastenings were...
deck was reinforced dynel&epoxy and painted antiskid epifanes, deck hardware replaced by bronze classic marine and deck prisms added.
prima restaurare yaht in romania
west system cold molded over strip planking.
stem; keel and stern post oak &epoxylaminated; wooden dowels and bronze screws reinforced. bulwarks oak and mahogany laminated.deck hardare bronze.
douglas fir-white spruce strip planking (routered) , West Sys. & barbed bronze nails fastened+3mm mahogany x 3 layers cold molded.
Then all -West Syst. coated