deck was reinforced dynel&epoxy and painted antiskid epifanes, deck hardware replaced by bronze classic marine and deck prisms added. prima...
the launching wich was quite happy; and went on well; at Constantza Industrial Harbor on a Sunny September perfect day details on...
vintage camper&nicholsons sloop restoration we rebuilt and replaced most framing by laminated framing; laminated floors; cold molded two...
Here are our core four craftsmen, Nicodim, Cotovanu , Paul, Lucian, plus three french students were helping through the summer:Marouene, Ramzy...
we rolled the hull over in order to make sanding ; epoxy penetration and cold molding more efficient . cold moulding three layers veneer; epoxy...
Al the steel fastenings through the +40 years old hull were badly corroded. All were removed and replaced by bronze fastenings; The framing was...
three layers veneer impregnated in epoxy; first two layers diagonally; third layer horizontally;three coats epoxy on the outside. the framing was...
42 ft hull turned for cold molding
our extra long spring passage sailing the Camper&Nicholson's 1963 sloop Rocquette Imperia/Italy to Constantza/Black Sea, 14 April - 18 June...
Designed and built Bucharest Romania 2003, Globalisation at work: boat was sold by means of internet advertising to Dutch Antilles. the...
Composite cruiser 27 test launching ;Giurgiu on Danube River.Photo taken secs before hitting water. Hull in polyester ; 50%vinylester and hand...
The 212 hp Steyr Turbo injection Diesel supported by okoume cored fiberglass framing, foam cored deck and cabin, mahogany&epoxy opening front...
Black Sea Cruiser 27 ; designed &built 2003 in Bucharest Romania composite/vinylester lobsterboat hull, 212 hp Steyr Diesel; Vetus...