Hi, would you please answer below question as this is very important for us. I know that you might be busy. "For Fs, could you please show me the...
Thanks.
Thanks. Do you have any reference for Cd=1 and also Cr=1 which you have considered in your calculation?
Hi and thanks for reply. These ballasts are fixed to the pipe and exist every 45m and their function is keeping the balance of pipes against...
Hi, I am trying to understand your calculation. 1. I think lamdba is 0.009 not 0.09. Would you plz confirm it? 2. For Fs, could you plz show me...
Hi All, Due to the existing balance concrete ballasts, the drag force between concrete ballast and water in towing operation should be calculated....
Hi and thanks for the reply. Due to existing balance concrete ballasts, the drag force between concrete ballast and water in towing operation...
Thanks a lot.
No, it is Tugboat. Thanks
[ATTACH] Hi all, does above paragraph work for me?
Thanks for kind reply. The pipe is floated therefore only a small portion of it is in touch with water. Do you have any example of your...
We have calculated the forces. They are about 10 ton. Wave height is 1.5 m, current is 1 m/s and the pipes will be moved about 2 km. How can we...
Thank you, yes they are floating.
Hi and thanks for your answer. Some of the specifications are: SM/1515, Internal Diameter: 2.5m, External Diameter: 2.752m, Thickness: 126mm,...