OK, lets try this again.
We our interested in this boat because it was essentially spec'd and designed to carry out the same missions as we want to use the boat for. The only real difference is that we are a secular organization so will not be proselytizing. Furthermore, the original owner passed away in 2022, but we would like for his family to see his dream completed rather than turned into a pleasure vessel. It also will allow for economical operation as we can rely on the sails for non-emergency transits. By utilizing the sails, lithium batteries, solar and a hybrid drive, we also are more environmentally-friendly which makes a difference to our donor base.
We would like to modify the design because the boat was designed to store cargo (vs ship's stores and personal luggage) in an over-sized secondary salon at amidship that was intended to serve as a classroom and tabernacle. Not only is the main mast running through this area, but our understanding is no freight door and that there are only a minimal number of actual cargo tie-down points in this "great room." What we would like to do is convert the portion of the room aft of the main mast into an incident command center while turning the area forward of the mast into a hold with sufficient tie-downs and an actual cargo hatch so cargo does not have to be handloaded breakbulk-style through the companionway. In a perfect world, the stretch would be off sufficient length that we could handle the various sizes of connexs (not ISO's) and/or aircraft freight "tins". This would allow for rapid transfer of both civilian-airlifted supplies as well as those from the military logistics chain (thus spec'd for connexs). It would also allow us to switch from the educational mission payload to the disaster relief payload in a couple of hours rather than a couple of days which not only allows us to deliver aid faster, but the fast transfer rate would help to free up the pier we would take on the relief supplies from.
To answer other questions in no particular order:
This is not the Tri-cities project. This one is further up-river.
The project uses specs and estimating spreadsheets that are around 15 years out of date. Some ship's systems are now obsolete or no longer produced, the engines can no longer be legally mounted, and most of every thing else has increased in cost. We spent several months contacting vendors to get current prices for everything on the build list, including new, compliant engines. Based of this research, it looks like price to completion would be around $2-$2.25 million assuming the labor hour estimates are slightly optimistic, but reasonable. We are hoping, but not planning, on it being a bit less since we are a 501 (c)(3) non-profit and can issue tax-deductible receipts for donated gear. The main reason there is variability in the estimate is that we are not sure how much labor costs will be as we are considering doing the outfitting overseas. Labor up to launch is most likely going to be locally sourced as the hull is at a port that has several aluminum small craft fabrication firms and thus boat builders and welders skilled in working with aluminum.
When we say we would operated this like a commercial vessel, we mean that the ship is built to meet ABS spec, the stability will not be lowered below USCG standards and the ship will have a rated Master and Mate, three non-rated deck hands and ideally a rated Engineer. The ship would be held to the same standards as a commercial charter yacht.
Finally, in answer to Banjan's question. I eventually realized the other project was just a massive vanity project so I could say I was both different and pushing the state of the art. I decided that if I am going to spend what would surely end up amounting to over a million dollars on a boat, I'd rather have something to make a difference with rather than just having a 216 foot ***** extension. While doing required research in my medical program, I found an article that mentioned that medical missions are appreciated but are ultimately just band-aids as the capability leaves when the mission does. My entry into medicine was via a program that was designed to address such a capacity shortage in rural Alaska. I decided that we could provide more than a band-aid by providing capacity building via exporting that program to coastal areas that were in need. Basically helping people to help themselves. So, I spent some of my boat money to form a non-profit, recruited a circle of like-minded people and have been working on putting the plan in motion ever since.
We our interested in this boat because it was essentially spec'd and designed to carry out the same missions as we want to use the boat for. The only real difference is that we are a secular organization so will not be proselytizing. Furthermore, the original owner passed away in 2022, but we would like for his family to see his dream completed rather than turned into a pleasure vessel. It also will allow for economical operation as we can rely on the sails for non-emergency transits. By utilizing the sails, lithium batteries, solar and a hybrid drive, we also are more environmentally-friendly which makes a difference to our donor base.
We would like to modify the design because the boat was designed to store cargo (vs ship's stores and personal luggage) in an over-sized secondary salon at amidship that was intended to serve as a classroom and tabernacle. Not only is the main mast running through this area, but our understanding is no freight door and that there are only a minimal number of actual cargo tie-down points in this "great room." What we would like to do is convert the portion of the room aft of the main mast into an incident command center while turning the area forward of the mast into a hold with sufficient tie-downs and an actual cargo hatch so cargo does not have to be handloaded breakbulk-style through the companionway. In a perfect world, the stretch would be off sufficient length that we could handle the various sizes of connexs (not ISO's) and/or aircraft freight "tins". This would allow for rapid transfer of both civilian-airlifted supplies as well as those from the military logistics chain (thus spec'd for connexs). It would also allow us to switch from the educational mission payload to the disaster relief payload in a couple of hours rather than a couple of days which not only allows us to deliver aid faster, but the fast transfer rate would help to free up the pier we would take on the relief supplies from.
To answer other questions in no particular order:
This is not the Tri-cities project. This one is further up-river.
The project uses specs and estimating spreadsheets that are around 15 years out of date. Some ship's systems are now obsolete or no longer produced, the engines can no longer be legally mounted, and most of every thing else has increased in cost. We spent several months contacting vendors to get current prices for everything on the build list, including new, compliant engines. Based of this research, it looks like price to completion would be around $2-$2.25 million assuming the labor hour estimates are slightly optimistic, but reasonable. We are hoping, but not planning, on it being a bit less since we are a 501 (c)(3) non-profit and can issue tax-deductible receipts for donated gear. The main reason there is variability in the estimate is that we are not sure how much labor costs will be as we are considering doing the outfitting overseas. Labor up to launch is most likely going to be locally sourced as the hull is at a port that has several aluminum small craft fabrication firms and thus boat builders and welders skilled in working with aluminum.
When we say we would operated this like a commercial vessel, we mean that the ship is built to meet ABS spec, the stability will not be lowered below USCG standards and the ship will have a rated Master and Mate, three non-rated deck hands and ideally a rated Engineer. The ship would be held to the same standards as a commercial charter yacht.
Finally, in answer to Banjan's question. I eventually realized the other project was just a massive vanity project so I could say I was both different and pushing the state of the art. I decided that if I am going to spend what would surely end up amounting to over a million dollars on a boat, I'd rather have something to make a difference with rather than just having a 216 foot ***** extension. While doing required research in my medical program, I found an article that mentioned that medical missions are appreciated but are ultimately just band-aids as the capability leaves when the mission does. My entry into medicine was via a program that was designed to address such a capacity shortage in rural Alaska. I decided that we could provide more than a band-aid by providing capacity building via exporting that program to coastal areas that were in need. Basically helping people to help themselves. So, I spent some of my boat money to form a non-profit, recruited a circle of like-minded people and have been working on putting the plan in motion ever since.