John McCrary
Junior Member
- Joined
- Oct 14, 2021
- Messages
- 11
- Reaction score
- 1
- Location
- Anchorage, AK
I am working with a medical charity that wants to field a long-ranged, mid-sized (100-150 tons displacement) disaster response boat. They have found an aluminum motor-sailer schooner project boat that is to the stage of having its hull assembled to the tack welded stage. Their thought process is that at that stage of construction, the boat is relatively easily refitted to accomodate their needs. They ideally wanted to add a dedicated cargo hold by stretching the hull amidships.
I was curious about how much of a hold could be added, but it appears the original architect is no longer in business so I can't just shoot them an RFP for the changes. Is there a rule of thumb for how much an aluminum hull can be stretched? I am asking because I am making the assumption that it would be significatly easier/faster/cheaper for the original architect to design the hold since they have not just the blueprints but also all the various things like CAD files and stability calcs. My thought process is that if there is a rule of thumb, it would allow us to judge if it was worth the extra expense of having a third-party reverse -engineering the design to add the hold. eg We do not want to spend tens of thousands of dollars if it would only net us an additional 100 cubic foot of cargo space (for exmple).
I was curious about how much of a hold could be added, but it appears the original architect is no longer in business so I can't just shoot them an RFP for the changes. Is there a rule of thumb for how much an aluminum hull can be stretched? I am asking because I am making the assumption that it would be significatly easier/faster/cheaper for the original architect to design the hold since they have not just the blueprints but also all the various things like CAD files and stability calcs. My thought process is that if there is a rule of thumb, it would allow us to judge if it was worth the extra expense of having a third-party reverse -engineering the design to add the hold. eg We do not want to spend tens of thousands of dollars if it would only net us an additional 100 cubic foot of cargo space (for exmple).