Hull turned over. Glassing the gutters of chines and keel area.
Troubling. Wanting a German Frers Design, why not ask him? Even German is probably tied up with Swan over not to duplicate too closely his own...
Bottom planking installed.
Topsides installed.
Basic framing on flat deck. The deck itself is not permanently bonded to beams and longitudinals at this stage.
Looking at the framing, planking and apparently the difficulty of getting proper solid wood, you might want to consider a construction in steel.
Pidgeon. Seagoer. With all due respect, you can do better. In terms of time and material while keeping the character of the vessel that you like.
small assembly on the flat.
Panel Layout.
Vixen Like Tad said, a much improved older Atkin's Colin Archer type. Vixen is somewhat limited by the narrow beam, very heavy displacement and...
We used the method of Filament winding to build carbon fiber free standing spars in the 70's. Epoxy resin and cured in an oil bath. The capability...
Another shot.
Another view.
Richard E. Carter. 1928-2007 Great thinker. Whenever there was a design challenge, he would never take no for an answer. Pushing the envelop. I...
Bow study.
An interpretation of the new ruling about bow section.
With the rule change in the forward section, there is no chance to see a full bowed Mini Transat to escalade to the 40 Class bar. Probably a good...
The Imagiro 39 (origami built in steel) fitted with a gaff rig.
Up-dated plans. Including an optional doghouse/pilothouse.
Gaff Rig for this 34' MBCC. TYD225