an2reir: structural rebuild
all floors and steel framing were taken off . original galvanised fastenings caused rot areas above LWL.
routered- off all rot ; epoxy-plugged the holes.all galvansed fastenings were replaced by bronze
The five galvanised ring frames were replaced by epoxy&wood laminated .
Posted by: an2reir - website: https://www.facebook.com/fifityboatdesigns
-
There are no comments to display.