structural rebuild
an2reir

an2reir: structural rebuild

all floors and steel framing were taken off . original galvanised fastenings caused rot areas above LWL. routered- off all rot ; epoxy-plugged the holes.all galvansed fastenings were replaced by bronze The five galvanised ring frames were replaced by epoxy&wood laminated .

Posted by: an2reir - website: https://www.facebook.com/fifityboatdesigns

an2reir, Oct 16, 2004
    There are no comments to display.
  • Category:
    Boatbuilding
    Uploaded By:
    an2reir
    Date:
    Oct 16, 2004
    View Count:
    10,483
    Comment Count:
    0