Boat Design Forums  |  Boat Design Directory  |  Boat Design Gallery  |  Boat Design Book Store  |  Thanks to Our Site Sponsors

User Name
Password
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

  Home · Search · Register  

Home » Boatbuilding » Boatbuilding Photo Options

Previous image   Slide Show   Next image

103rocquette_framing_repair_work
framing rebuild work

Previous image   Slide Show   Next image

more
2648Mirabella3.jpg
146woodshop-3_jpg.jpg
103rocquette_framing_repair_work.jpg
103structural_rebuild.jpg
2180int_moth_ger-1045.jpg
more

Photo Details
an2reir


Senior Member

Registered: September 2001
Location: Macau Hong Kong Canton Bucharest
Posts: 495
users gallery
More than half of total frames were reinforced by taking out rotten areas and fitting in epoxy laminated scarfed reinforcements.
Old galvanised floors were being replaced by laminated wood floors epoxy capsulated as were all knees and ring frames and beams; engine bearing support and mast bearing support.bilges cleaned and epoxy capsulated.
· Date: October-15-2004 · Views: 8758
· Filesize: 62.0kb ·
Additional Info
Keywords: yacht building, restauration



All times are GMT -5. The time now is 05:45 PM.


Powered by: vBulletin Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Web Site Design and Content Copyright ©1999 - 2012 Boat Design Net