|
||||
|
||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Photo Details
|
|
|
an2reir Senior Member Registered: September 2001 Location: Bucharest Romania Posts: 427 ![]() |
first we took the paint off the entire hull and deck. the hull structure is resorcinol one layer of 10mm cold molded mahogany over inner 9mm spruce double planking hull ;
ballast keel was removed ,by cutting off the 40mm diam steel keel bolts; rot areas detected, keel wood left to dry, all rot taken out. |
| · Date: July-29-2004 · Views: 10373 · Filesize: 408.9kb · |
|
| Additional Info | |
| Keywords: Andrei Rochian Boat Building China barci ambarcatiuni yacht restauration,yahturi, construction bateaux, astillero, bristol channel cutter, sloop, barc | |