Given deck loading, can we find deadweight?

Hi guys...need little help here, as per above subject, could we find deadweight by deck loading (20MT/m2) given?

if can, what is the formula?

thanks in advance
Reply With Quote
  #2  
Old 05-07-2010, 04:44 AM
Perm Stress's Avatar
Perm Stress Perm Stress is offline
Senior Member
 
Join Date: Sep 2009
Rep: 323 Posts: 523
Location: Lithuania
20MT/m2 mean 20ton per square meter?
that's hell of a lot for deck loading!
5t/m2 is already real pain to design supporting structure for...

If there you talk about inner bottom load of large cargo ship, 20t/m2 is perfectly possible, but this will mean "heavy cargo" situation, i.e., only part of hold area will be taken by some heavy items, like steel rolls, locomotives, ore, etc..
So the answer is: "most probably, no".

Dead weight could be found by subtracting lightship weight from displacement at full summer draught.
__________________
All the stresses in my designs are 95% of permissible.
Reply With Quote
  #3  
Old 05-07-2010, 05:00 AM
ejim ejim is offline
Not Really Junior Member
 
Join Date: Apr 2010
Rep: 10 Posts: 8
Location: Malaysia
Dear Perm Stress,

Thanks for your quick reply and answer. Forget to mention that im talking about barge...simple form...which is 76m length.

the answer is no, so why on earth it state Deck Loading: 20MT/m2 in GA?what its purpose then?

"Dead weight could be found by subtracting lightship weight from displacement at full summer draught."
next question: how to find lightship eh?

Again, thank you very much
Reply With Quote
  #4  
Old 05-07-2010, 06:49 AM
Perm Stress's Avatar
Perm Stress Perm Stress is offline
Senior Member
 
Join Date: Sep 2009
Rep: 323 Posts: 523
Location: Lithuania
Quote:
Originally Posted by ejim View Post
Dear Perm Stress,

Thanks for your quick reply and answer. Forget to mention that im talking about barge...simple form...which is 76m length.

the answer is no, so why on earth it state Deck Loading: 20MT/m2 in GA?what its purpose then?

"Dead weight could be found by subtracting lightship weight from displacement at full summer draught."
next question: how to find lightship eh?

Again, thank you very much
probably, if it is not typing error, 20t/m2 (2.0t/m2 is quite in the range for ro-ro carrier) mean very strong structure, suited for transprt of heavy items and cargoes to dense to fill all the available cargo space without sinking the boat.

lightship weight= metal hull+outfitting+paint and corrosion protection+machinery+accommodations+anchors and other equipment...

no one said it is easy.

on the other hand, you can use statistics, especially for inland barges, as their weight is pretty stable figure for each size in question.
__________________
All the stresses in my designs are 95% of permissible.
Reply With Quote
  #5  
Old 05-07-2010, 11:48 AM
jehardiman jehardiman is offline
Senior Member
 
Join Date: Aug 2004
Rep: 1758 Posts: 1,561
Location: Port Orchard, Washington, USA
Question here

If the deck loading is 20MT/m^2, what is the total load? Total will determine the barge size which scales displacement.

Or is it that the barge deck has to be designed to support 20MT/m^2 since you already have a length? That will determine the structure and therefore lightship weight.
__________________
A vessel is nothing but a bunch of opinions and compromises held together by the faith of the builders and engineers that they did it correctly. Therefor the only thing a Naval Architect has to sell is his opinion.
Reply With Quote
  #6  
Old 05-10-2010, 12:44 AM
conceptia's Avatar
conceptia conceptia is offline
Naval Architect
 
Join Date: Nov 2009
Rep: 97 Posts: 193
Location: Abu Dhabi
jehardiman,

Barge you may be looking for is a deck loading barge. It will be used to carry equipments overboard. In some cases, for example in a reactor carrier barge, the reactor(lets say 500 tons) wont be directly placed on the deck. They will be provided with deck stools, on which the reactor structure is going to sit. So, the total area on which the load is acting is less, thus increasing the pressure load(stress). -[remember the formula stress = total load acting/total area on which the load is acting]. Hope you got the point.
Now regarding the deadweight(I assume this is a dumb deck-loading barge)- in the GA you will find the equipments, please find the weight of them, total them and it is your deadweight.
__________________
Cheers
Aswin
"Aim of any argument or discussion must not be victory, but progress."
Reply With Quote
  #7  
Old 05-10-2010, 06:32 AM
conceptia's Avatar
conceptia conceptia is offline
Naval Architect
 
Join Date: Nov 2009
Rep: 97 Posts: 193
Location: Abu Dhabi
Quote:
Originally Posted by conceptia View Post
jehardiman,
In some cases, for example in a reactor carrier barge, the reactor(lets say 500 tons) wont be directly placed on the deck. They will be provided with deck stools, on which the reactor structure is going to sit. So, the total area on which the load is acting is less, thus increasing the pressure load(stress). -[remember the formula stress = total load acting/total area on which the load is acting].
I meant the deck stools will be inducing the load onto the deck. This will be produce a high stress as the area of contact will be less, and concentration of the load will be higher.
__________________
Cheers
Aswin
"Aim of any argument or discussion must not be victory, but progress."
Reply With Quote
  #8  
Old 05-10-2010, 08:54 AM
jehardiman jehardiman is offline
Senior Member
 
Join Date: Aug 2004
Rep: 1758 Posts: 1,561
Location: Port Orchard, Washington, USA
Quote:
Originally Posted by conceptia View Post
jehardiman,

Barge you may be looking for is a deck loading barge. It will be used to carry equipments overboard. In some cases, for example in a reactor carrier barge, the reactor(lets say 500 tons) wont be directly placed on the deck. They will be provided with deck stools, on which the reactor structure is going to sit. So, the total area on which the load is acting is less, thus increasing the pressure load(stress). -[remember the formula stress = total load acting/total area on which the load is acting]. Hope you got the point.
Now regarding the deadweight(I assume this is a dumb deck-loading barge)- in the GA you will find the equipments, please find the weight of them, total them and it is your deadweight.
Quote:
Originally Posted by conceptia View Post
I meant the deck stools will be inducing the load onto the deck. This will be produce a high stress as the area of contact will be less, and concentration of the load will be higher.
Oh yes, I understand heavy deck barges, I just wonder if the OP does.

FWIW, a distributed load of 20MT/m^2 is large but manageable, less than 2ST/ft^2 (a common heavy barge deck) or ~30 psi: equal to the loading of a 7m pile of taconite pellets, or twice normal wave slap. But for a 75m x 25(?)m barge that is a total deck load of 37,500 MT which is unreasonable for a 75m barge. More reasonable is deck load 20MT/m^2 over a 100 m^2 area giving a total deck load of 2,000MT for a 75mx25mx~4m barge which is about right.
__________________
A vessel is nothing but a bunch of opinions and compromises held together by the faith of the builders and engineers that they did it correctly. Therefor the only thing a Naval Architect has to sell is his opinion.
Reply With Quote
  #9  
Old 05-10-2010, 10:24 PM
conceptia's Avatar
conceptia conceptia is offline
Naval Architect
 
Join Date: Nov 2009
Rep: 97 Posts: 193
Location: Abu Dhabi
the first thing you must understand is the deck strength is the strength of your deck on accounts of the max load it can carry. That is how its significance has to be understood. It wont help you to find the total dead weight.
To find the lightship mass, it better you calculate the steel mass.
__________________
Cheers
Aswin
"Aim of any argument or discussion must not be victory, but progress."
Reply With Quote
  #10  
Old 05-14-2010, 08:22 PM
glitgirl glitgirl is offline
 
Join Date: May 2010
Rep: 10 Posts: 4
Location: china-shanghai
hi,I think 20T/M2 just a local strength of the main deck,the deadweight is decided the freeboard and the lightship.my company have maked many barge.I want to learn the FASTSHIP ,anyone can provide me some manual,tank u.
Reply With Quote
  #11  
Old 05-18-2010, 02:24 AM
ejim ejim is offline
Not Really Junior Member
 
Join Date: Apr 2010
Rep: 10 Posts: 8
Location: Malaysia
Hi to all senior member and all naval architect

thank you for your info and knowledge sharing, but i have another question here...
let say, the deadweight of this barge is approximately 3000 tonnes, how many BHP of tug boat required to tow this barge eh?
how to calculate required BHP to pull this barge?
Reply With Quote
  #12  
Old 05-23-2010, 01:33 PM
conceptia's Avatar
conceptia conceptia is offline
Naval Architect
 
Join Date: Nov 2009
Rep: 97 Posts: 193
Location: Abu Dhabi
pal for that you need to do the resistance calculation. That does not depend upon da deadweight. It depends on da hull form(under water surface area, LCB, VCG, mass displacement of the vessel). So better download freeship and try doin resistance calculation.
__________________
Cheers
Aswin
"Aim of any argument or discussion must not be victory, but progress."
Reply With Quote
  #13  
Old 06-04-2010, 07:29 AM
petlily petlily is offline
Junior Member
 
Join Date: Jul 2006
Rep: 10 Posts: 29
Location: MALAYSIA
There is a good reference on how to calculate the total resistance of a barge that takes into consideration the bow shape and hull surface;

Oilfield Publication, Volume 4, "Towing" by Michael Hancox, page 365-366.

There are formulas for Frictional resistance, wave resistance and wind resistance (hull & deck cargo) that sum up the total resistance in those pages.
Reply With Quote
Reply



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Sail Loading on Rig, Rig Loading on Vessel brian eiland Sailboats 93 02-23-2011 07:19 PM
Bottom Loading TollyWally Boat Design 18 07-20-2009 05:40 PM
Mast Loading kenJ Sailboats 2 07-01-2008 07:14 PM
Engine loading operator Boat Design 8 04-25-2005 05:07 PM
Bottom Loading Willallison Option One 3 06-04-2002 09:03 AM


All times are GMT -5. The time now is 06:15 AM.


Powered by: vBulletin Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Web Site Design and Content Copyright ©1999 - 2012 Boat Design Net