Boat Design Forums  |  Boat Design Directory  |  Boat Design Gallery  |  Boat Design Book Store  |  Thanks to Our Site Sponsors

Go Back   Boat Design Forums > Construction > Boatbuilding > Fiberglass and Composite Boat Building
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 12-04-2009, 03:02 AM
Gades Gades is offline
Senior Member
 
Join Date: Nov 2001
Rep: 74 Posts: 125
Location: Mallorca
layup schedule for a hatch

hi there,
I have to build a hatch for a 31 footer.
The original one broke in 3 pieces, and I have a similar one from another boat.

I am just wondering about the layup schedule.

The original hatch is made of methacrylate, about 1 cm thickness. The dimensions are more or less 100x50 cm.

I was thinking of a using Rovin600 and MAT300, with PVC of 1cm. Maybe around 4 or 5 layers on top and 3 or 4 at the bottom.

What do you think?
__________________
back to composites....

---------------

Quote:
Bill Gates is a very rich man today... and do you want to know why? The answer is one word: versions.
Dave Barry
Reply With Quote
Reply



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Direction on where to find a Layup schedule for a 22' speedboat? dregsz Fiberglass and Composite Boat Building 8 09-08-2008 08:45 PM
Layup schedule grady Powerboats 6 05-19-2007 07:28 AM
Tayana 37 layup schedule Vince Hosea Sailboats 1 09-18-2006 09:28 PM
Canadian Canoe layup schedule cadmec Fiberglass and Composite Boat Building 7 11-05-2005 10:38 AM
Boat bottom Layup schedule Ben Clegg Materials 0 04-15-2003 05:57 PM


All times are GMT -5. The time now is 12:20 PM.


Powered by: vBulletin Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Web Site Design and Content Copyright ©1999 - 2012 Boat Design Net