| ||||
|
#1
| |||
| |||
| Rib Buoyancy According Iso 6185/3 hello designers and "wanbe" designers! I would like to ask a question in those who have used this standard. The "buoyancy of the rib" witch is involved in some basic equations according to the standard is (paragraph 3-3.4) :the inflated buoyancy and the permanent inherent buoyancy or at least two compartements of permanent sealed buoyancy ,fixed to the rigid hull, not exceeding 20% of the total buoyancy. can you please explain that to me. for example: if we say a=inflated volume b=the perm.inherent buoyancy or the perm.sealed buoyancy then a+b=T(total volume) but b<=0.2T so a+0.2T=T a=T*0.8 T=a/0.8 which means the volume is 10/8 *a=1.25a Am i wright? thank you very much and sorry for stealing you time |
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| RIB buoyancy calculation according ISO-6185/3 | GREEKFLEET | Class Societies | 1 | 02-23-2008 03:57 AM |
| buoyancy assesment | Bluedesign | Boat Design | 1 | 07-13-2007 06:58 PM |
| Iso 6185 | Toplana | Stability | 3 | 05-22-2007 04:26 PM |
| Buoyancy vs Weight | halfboat | Boat Design | 3 | 03-16-2007 08:55 AM |
| Buoyancy and floatation measurement | enu | Boat Design | 12 | 08-21-2006 08:18 AM |