Thanks Dreamer!
http://www.dpi.wa.gov.au/mediafiles/mar_cv_info_030.pdf
I thought that a General Arrangement plan is much more simple, and - as a basis for scantling - only contains structural elements. Now I am back to drawing.
2. General Arrangement (GA) drawing(s) must show the following:
· Profile of the vessel (both port and starboard sides if they are significantly different).
· Plan of each deck.
· Table of vessel principal particulars indicating the vessels dimensions to be used for
scantling calculations, namely:
USL Class (e.g.; 2B)
Overall length, (m)
Measured length, (m)
Moulded beam, (m)
Displacement for scantling calculations (at deepest operational draft), (t)
Waterline length at scantling displacement, (m)
Waterline beam at scantling displacement, (m)
Hull draft at scantling displacement, (m)
Vessel speed at scantling displacement, (kts)
Number of passengers and crew
· Bulkhead locations. Watertight bulkheads are to be labelled and watertight doors to
shown.
· Frame locations and spacings.
· Access ways, steps and ladders.
· Bulwarks and railings. Minimum height and spacing of bulwark and rails to be noted in
the drawing.
· All spaces to be labelled indicating their use.
· The location and sill/coaming height of all hatches, doors and removable panels.
· Seats, Berths, Toilets.
· Navigation lights.
· Freeing ports.
· Location of all ventilation grills and closing devices.
· Deck machinery (windlass, fishing gear etc.).
· Fixed buoyancy and ballast.
· Escapes.
· All tanks.
· Anchor and chain lockers.
· Liferafts and floating off buoyancy.