| ||||
|
#1
| |||
| |||
| About lifting operation through hatch Hello all, Now, i meet one question about lifting operation through hatches. the zone below the hatches is blind zone for the main deck crane, so i need to add one new crane(swl 5t), but when lifting, the load may crash other equipment, piping and structure etc in the cargo lift shaft. and the new crane should be used to lift injured person through hatches. what is the difference between the cargo crane and personnel crane? i do not know how to resolve. pls help me thanks |
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Current speed for boat operation | Opa | Boat Design | 0 | 02-22-2009 02:59 AM |
| Ideal Power for displacement operation | joebobb | Boat Design | 4 | 03-05-2005 03:30 PM |
| Fishing Vessel Operation | Hamidi | Education | 2 | 08-29-2004 01:29 PM |
| Power for planing vs displacement operation | Tom_McGuinness | Powerboats | 10 | 02-02-2004 01:44 PM |
| speed and prop operation theories | curtis73 | Powerboats | 7 | 03-23-2002 06:27 PM |