The cost of the feasibility study is part of architectural and engineering costs, estimated with total costs. Actual total turn-key construction costs cannot be accurately known until the architecture and engineering phases are completed for any specific vessel design. Since the Hydro Lance has approximately 30% more area of skin and ribs, we project that the material and construction costs, beyond the first like ship, may have about the same percentage of cost increase, then having lower costs in mass modular-production, as compared with a conventional ship. Depending on the selected construction ship-yard, a capital cost of approximately $12,000-18,000.00 per displacement ton of ship constructed, is a "thumb nail" estimate of the first mission specific HARTH blue-water class ship - from womb to operational status, depending on customer requirements and custom variables.
The variables of the mission statement, the 'luxury factor' of interior design of each application and client, and other technical variables make a more accurate cost/price estimates impossible to make, until the Architectural and Engineering phase of each ship is completed. This is, of course, the same for any new conventional type ship to be constructed. Noteworthy is that a conversion, made from certain types of existing vessels, could save up to half of this cost (See Conversions), or more.