sigurd
05-23-2007, 11:46 AM
Hi,
In the regattas with my father's albin express it can sometimes be a bit messy to take off the winch handle, let go the sheet, move to the other side, pull in new sheet, put on handle and winch the last bit. Usually it goes ok. But there is not always a convenient time to go down and put the next tack's sheet around the winch to make everything ready again. And the spinaker is on the same two winches which is also ok but can be a bit messy too when both jib and the spin is up.
So I thought that maybe this winch here could make things go smoother . In the tack I could maybe grab the green sheets on the new ww side directly for 1:1 fast retrieval, then drop it and pull the red line for fine adjustment.
Don't know if it would be allowed by the class rules.
What you think?
In the regattas with my father's albin express it can sometimes be a bit messy to take off the winch handle, let go the sheet, move to the other side, pull in new sheet, put on handle and winch the last bit. Usually it goes ok. But there is not always a convenient time to go down and put the next tack's sheet around the winch to make everything ready again. And the spinaker is on the same two winches which is also ok but can be a bit messy too when both jib and the spin is up.
So I thought that maybe this winch here could make things go smoother . In the tack I could maybe grab the green sheets on the new ww side directly for 1:1 fast retrieval, then drop it and pull the red line for fine adjustment.
Don't know if it would be allowed by the class rules.
What you think?